Regulation (EU) 2025/2347 is applicable from 1 January 2026. The fees for POA are outlined in Table 10 of the Annex – Part I to the regulation.
The fee category is determined by two elements:
- the value (as mentioned in the manufacturer’s list prices) of the most expensive product, part or non-installed equipment that is included in the approved POA scope of work (capability list) of the EASA POA holder
- the number of staff related to the activities under the scope of the POA
The approval fee in Table 10 is due per application.
The surveillance fee is due every 12 months from POA issuance.