FAQ n.104868

Is there an operational requirement which mandates Design Organisations to communicate the Performed Based Navigation (PBN) needs as well as all xxx.IDE technical requirements to the CAMO?

Answer

It is an essential requirement of the Basic Regulation that the Operators ensure the continued airworthiness of the aircraft and the serviceability of all the equipments required for the intended operation (be it Performed Based Navigation or anything else), as per Annex V point 6.1. It is also a responsibility of the Operators to ensure that, when maintenance is performed by a third party, it complies with all safety requirements applicable to the Operators (point 6.6). That includes communicating to the CAMO all the specific needs that may relate to PBN or any other operation being conducted.

Last updated
18/10/2019

Was this helpful?