Subcontracting

Do I, as a DOA holder, need to make any specific arrangements when I'm cooperating with a vendor (design and build)?

First of all, to answer this question it must be defined what is considered a vendor.

For the purpose of this FAQ, a vendor is defined as a company providing a specific design and manufacturing that design – a so-called vendor item.

Further to this vendor item:

  • it is anticipated that the design details of the vendor item may not necessarily be known by the DOA holder;
  • consequently, this approach is feasible only for low risk items.

The cooperation of the DOA holder with such a vendor must be described in the Design Organisation Handbook as part of the Subcontractor Control process.

The Subcontractor Control process for vendors, as a minimum, should describe how the DOA holder:

  • assesses the criticality (risk) of the vendor item;
  • defines the interface with the vendor;
  • controls the design configuration of the vendor item.

The Subcontractor control process for vendors can be a form of high level control, based on technical specifications, and a verification process ensuring that the vendor item meets the technical specification, and having in the contract with the vendor an effective mechanism for information about changes - both ways. The DOA holder’s procedures should identify an appropriate entry point into the documentary system (e.g. DO/PO arrangement, contract, quality plan, handbooks, common applicable procedures, working plans, etc.).

View

Was this helpful?

Vote up  15
Vote down  2

What are the expectations of the Agency in respect to the control of subcontractors by a design organisation?

Please refer to the good practices published on EASA website at this link here.