Filters
Appendix VI to AMC M.B.602(f) — EASA Form 6F
ED Decision 2020/002/R
M.A. SUBPART F APPROVAL RECOMMENDATION REPORTEASA FORM 6F | |
Part 1: General Name of organisation: Approval reference: Requested approval rating/ EASA Form 3 dated*: Other approvals held (If app.) Address of facility audited: | |
Audit period: from | to |
Date(s) of audit(s): Audit reference(s): Persons interviewed: | |
Competent authority surveyor: Competent authority office: | Signature(s): Date of EASA Form 6F part 1 completion: *delete where applicable |
| |||||||||||||||
Part 2: M.A. Subpart F Compliance Audit Review | |||||||||||||||
The five columns may be labelled and used as necessary to record the approval product line or facility, including subcontractor’s, reviewed. Against each column used of the following M.A. Subpart F subparagraphs please either tick () the box if satisfied with compliance or cross (X) the box if not satisfied with compliance and specify the reference of the Part 4 finding next to the box or enter N/A where an item is not applicable, or N/R when applicable but not reviewed. | |||||||||||||||
Para | Subject | ||||||||||||||
Extent of approval | |||||||||||||||
Maintenance Organisation | |||||||||||||||
Manual (see Part 3) | |||||||||||||||
Facilities | |||||||||||||||
Personnel requirements | |||||||||||||||
Certifying staff and | |||||||||||||||
airworthiness review staff | |||||||||||||||
Components, Equipment and | |||||||||||||||
tools | |||||||||||||||
Maintenance data | |||||||||||||||
Maintenance work orders | |||||||||||||||
Maintenance standards | |||||||||||||||
Aircraft certificate of release to | |||||||||||||||
service | |||||||||||||||
Component certificate of | |||||||||||||||
release to service | |||||||||||||||
Maintenance and airworthiness | |||||||||||||||
review records | |||||||||||||||
Privileges of the organisation | |||||||||||||||
Organisational review | |||||||||||||||
Changes to the approved | |||||||||||||||
maintenance organisation | |||||||||||||||
Findings | |||||||||||||||
Competent authority surveyor(s): | Signature(s): | ||||||||||||||
Competent authority office: | Date of EASA Form 6F part 2 completion: | ||||||||||||||
M.A. SUBPART F APPROVAL RECOMMENDATION REPORTEASA FORM 6F | ||
Part 3: Compliance with M.A. Subpart F maintenance organisation manual (MOM) Please either tick () the box if satisfied with compliance; or cross (x) if not satisfied with compliance and specify the reference of the Part 4 finding; or enter N/A where an item is not applicable; or N/R when applicable but not reviewed. | ||
Part A | General | |
1.1 | Table of content | |
1.2 | List of effective pages | |
1.3 | Record of amendments | |
1.4 | Amendment procedure | |
1.5 | Distribution | |
1.6 | Accountable manager’s statement | |
Part B | Description | |
2.1 | Organisation’s scope of work | |
2.2 | General presentation of the organisation | |
2.3 | Name and title of management personnel | |
2.4 | Organisation chart | |
2.5 | Certifying staff and airworthiness review staff | |
2.6 | Personnel | |
2.7 | General description of the facility | |
2.8 | Tools, equipment and material | |
2.9 | Maintenance data | |
Part C | General procedures | |
3.1 | Organisational review | |
3.2 | Training | |
3.3 | Subcontracting of specialised services | |
3.4 | One time authorisations | |
M.A. SUBPART F APPROVAL RECOMMENDATION REPORTEASA FORM 6F | ||
Part 3: Compliance with M.A. Subpart F maintenance organisation manual (MOM) | ||
Part D | Working Procedures | |
4.1 | Work order acceptance | |
4.2 | Preparation and issue of work package | |
4.3 | Logistics | |
4.4 | Execution | |
4.5 | Release to service – Certifying staff | |
4.6 | Release to service – Supervision | |
4.7 | Release to service – Certificate of release to service | |
4.8 | Records | |
4.9 | Airworthiness review procedures and records for ELA1 aircraft not involved in commercial operations | |
4.10 | [Reserved] | |
4.11 | Special procedures | |
4.12 | Occurrence reporting | |
4.13 | Management of indirect approval of the manual | |
Part E | Appendices | |
5.1 | Sample of all documents used | |
5.2 | List of subcontractors. | |
5.3 | List of maintenance locations | |
5.4 | List of Part-145, M.A. Subpart F or Part-CAO organisations | |
MOM reference:MOM amendment: Competent authority audit staff:Signature(s): Competent authority office: Date of EASA Form 6F part 3 completion: | ||
M.A. SUBPART F APPROVAL RECOMMENDATION REPORTEASA FORM 6F | |||||
Part 4: Findings regarding M.A. Subpart F compliance status Each level 1 and 2 finding should be recorded whether it has been rectified or not and should be identified by a simple cross reference to the Part 2 requirement. All non-rectified findings should be copied in writing to the organisation for the necessary corrective action. | |||||
Part 2 or 3 ref. | Audit reference(s): Findings | L e v e l | Corrective action | ||
Date Due | Date Closed | Reference | |||
|
Part 5: M.A. Subpart F approval or continued approval or change recommendation |
Name of organisation: Approval reference: Audit reference(s): The following M.A. Subpart F scope of approval is recommended for this organisation: Or, it is recommended that the M.A. Subpart F scope of approval specified in EASA Form 3 referenced ...................................................... be continued. Name of recommending competent authority surveyor: Signature of recommending competent authority surveyor: Competent authority office: Date of recommendation: EASA Form 6F review (quality check):Date: |