APPENDICES TO AMC AND GM TO ANNEX I (Part-M)
Appendix I to AMC M.A.302 and AMC M.B.301(b) — Content of the maintenance programme
ED Decision 2023/013/R
Note: For the purpose of this Appendix, references to CAMO should be understood as references to CAMO or CAO and references to Part-145 organisations should be understood as references to Subpart F or Part-CAO organisations.
1.General requirements
1.1.The maintenance programme should contain the following basic information.
1.1.1.The type/model and registration number of the aircraft, engines and, where applicable, auxiliary power units and propellers.
1.1.2.The name and address of the owner, operator or CAMO managing the aircraft airworthiness.
1.1.3.The reference, the date of issue and issue number of the approved maintenance programme.
1.1.4.A statement signed by the owner, operator or CAMO managing the aircraft airworthiness to the effect that the specified aircraft will be maintained to the programme and that the programme will be reviewed and updated as required.
1.1.5.Contents/list of effective pages and their revision status of the document.
1.1.6.Check periods, which reflect the anticipated utilisation of the aircraft. Such utilisation should be stated and include a tolerance of not more than 25%. Where utilisation cannot be anticipated, calendar time limits should also be included.
1.1.7.Procedures for the escalation of established check periods, where applicable and acceptable to the competent authority of registry.
1.1.8.Provision to record the date and reference of approved amendments incorporated in the maintenance programme.
1.1.9.Details of pre-flight maintenance tasks that are accomplished by maintenance staff.
1.1.10. The tasks and the periods (intervals/frequencies) at which each part of the aircraft, engines, APU’s, propellers, components, accessories, equipment, instruments, electrical and radio apparatus, together with the associated systems and installations should be inspected. This should include the type and degree of inspection required.
1.1.11. The periods at which components should be checked, cleaned, lubricated, replenished, adjusted and tested.
1.1.12. If applicable details of ageing aircraft system requirements together with any specified sampling programmes.
1.1.13. If applicable, details of specific structural maintenance programmes including, but not limited to:
(a)(Supplemental) structural inspection programmes ((S)SIPs or (supplemental) structural inspection documents (S)SIDs) issued by the design approval holder or the declarant of a declaration of design compliance.
(b)Corrosion prevention and control programmes (CPCPs) taking into account the baseline CPCP issued by the design approval holder or the declarant of a declaration of design compliance.
(c)For large aeroplanes, maintenance data arising from compliance with the ageing structure requirements of point 26.370 of Annex I (Part-26) to Regulation (EU) 2015/640.
1.1.14. If applicable, details of Critical Design Configuration Control Limitations together with appropriate procedures.
1.1.15. If applicable a statement of the limit of validity in terms of total flight cycles/calendar date/flight hours for the structural programme in 1.1.13.
1.1.16. The periods at which overhauls and/or replacements by new or overhauled components should be made.
1.1.17. A cross-reference to other documents approved by EASA which contain the details of maintenance tasks related to mandatory life and inspection limitations, Certification Maintenance Requirements (CMRs) and ADs.
Note: To prevent inadvertent variations to such tasks or intervals these items should not be included in the main portion of the maintenance programme document, or any planning control system, without specific identification of their mandatory status.
1.1.18. Details of, or cross-reference to, any required reliability programme or statistical methods of continuous Surveillance.
1.1.19. A statement that practices and procedures to satisfy the programme should be to the standards specified in the maintenance instructions issued by the TC holder or the declarant of a declaration of design compliance. In the case of approved practices and procedures that differ, the statement should refer to them.
1.1.20. Each maintenance task quoted should be defined in a definition section of the programme.
2.Programme basis
2.1.An owner or a CAMO aircraft maintenance programme should normally be based upon the MRB report, where applicable, and the maintenance planning document or Chapter 5 of the maintenance manual from the TC holder or the declarant of a declaration of design compliance (i.e. the manufacturer’s recommended maintenance programme).
The structure and format of these maintenance recommendations may be re-written by the owner or the CAMO to better suit the operation and control of the particular maintenance programme.
2.2.For a new aircraft where no previously approved maintenance programme exists, it will be necessary for the owner or the CAMO to comprehensively appraise the manufacturer’s recommendations (and the MRB report where applicable), together with other airworthiness information, in order to produce a realistic programme for approval.
2.3.For existing aircraft types it is permissible for the owner or CAMO to make comparisons with maintenance programmes previously approved. It should not be assumed that a programme approved for one owner or the CAMO would automatically be approved for another.
Evaluation should be made of the aircraft/fleet utilisation, landing rate, equipment fit and, in particular, the experience of the owner or the CAMO when assessing an existing programme.
Where the competent authority is not satisfied that the proposed maintenance programme can be used as is, the competent authority should request appropriate changes such as additional maintenance tasks or de-escalation of check frequencies as necessary.
2.4.Critical Design Configuration Control Limitations (CDCCL)
If CDCCL have been identified for the aircraft type by the TC/STC holder, maintenance instructions should be developed. CDCCL’s are characterised by features in an aircraft installation or component that should be retained during modification, change, repair, or scheduled maintenance for the operational life of the aircraft or applicable component or part.
3.Amendments
Amendments (revisions) to the approved maintenance programme should be made by the owner or the CAMO, to reflect changes in the recommendations, modifications, service experience of the TC holder or the declarant of a declaration of design compliance, or as required by the competent authority.
4.Permitted variations to maintenance periods
The owner or the CAMO may only vary the periods prescribed by the programme with the approval of the competent authority or through a procedure developed in the maintenance programme and approved by the competent authority.
5.Periodic review of maintenance programme contents
5.1.The owner- or the CAMO-approved maintenance programmes should be subject to periodic review to ensure that they reflect current recommendations issued by the TC holder or the declarant of a declaration of design compliance, revisions to the MRB report if applicable, mandatory requirements and the maintenance needs of the aircraft.
5.2.The owner or the CAMO should review the detailed requirements at least annually for continued validity in the light of operating experience.
6.Reliability Programmes
6.1.Applicability
6.1.1.A reliability programme should be developed in the following cases:
(a)the aircraft maintenance programme is based upon MSG-3 logic;
(b)the aircraft maintenance programme includes condition monitored components;
(c)the aircraft maintenance programme does not contain overhaul time periods for all significant system components;
(d)when specified by the Manufacturer’s maintenance planning document or MRB.
6.1.2.A reliability Programme need not be developed in the following cases:
(a)the maintenance programme is based upon the MSG-1 or 2 logic but only contains hard time or on condition items;
(b)the aircraft is not a complex motor-powered aircraft according to Part-M;
(c)the aircraft maintenance programme provides overhaul time periods for all significant system components;
(d)Note: for the purpose of this paragraph, a significant system is a system the failure of which could hazard the aircraft safety.
6.1.3.Notwithstanding paragraphs 6.1.1 and 6.1.2 above, a CAMO may however, develop its own reliability monitoring programme when it may be deemed beneficial from a maintenance planning point of view.
6.2.Applicability for CAMO/operator of small fleets of aircraft.
6.2.1.For the purpose of this paragraph, a small fleet of aircraft is a fleet of less than 6 aircraft of the same type.
6.2.2.The requirement for a reliability programme is irrespective of the CAMO fleet size.
6.2.3.Complex reliability programmes could be inappropriate for a small fleet. It is recommended that such CAMOs tailor their reliability programmes to suit the size and complexity of operation.
6.2.4.One difficulty with a small fleet of aircraft consists in the amount of available data which can be processed: when this amount is too low, the calculation of alert level is very coarse. Therefore ’alert levels‘ should be used carefully.
6.2.5.A CAMO of a small fleet of aircraft, when establishing a reliability programme, should consider the following:
(a)The programme should focus on areas where a sufficient amount of data is likely to be processed.
(b)When the amount of available data is very limited, the CAMO engineering judgement is then a vital element. In the following examples, careful engineering analysis should be exercised before taking decisions:
•A ‘0’ rate in the statistical calculation may possibly simply reveal that enough statistical data is missing, rather that there is no potential problem.
•When alert levels are used, a single event may have the figures reach the alert level. Engineering judgement is necessary so as to discriminate an artefact from an actual need for a corrective action.
In making his engineering judgement, a CAMO is encouraged to establish contact and make comparisons with other CAMOs of the same aircraft, where possible and relevant. Making comparison with data provided by the manufacturer may also be possible.
6.2.6.In order to obtain accurate reliability data, it should be recommended to pool data and analysis with one or more other CAMO(s). Paragraph 6.6 of this paragraph specifies under which conditions it is acceptable that CAMOs share reliability data.
6.2.7.Notwithstanding the above there are cases where the CAMO will be unable to pool data with other CAMO, e.g. at the introduction to service of a new type. In that case the competent authority should impose additional restrictions on the MRB/MPD tasks intervals (e.g. no variations or only minor evolution are possible, and with the competent authority approval).
6.3.Engineering judgement
6.3.1.Engineering judgement is itself inherent to reliability programmes as no interpretation of data is possible without judgement. In approving the CAMO maintenance and reliability programmes, the competent authority is expected to ensure that the organisation which runs the programme (it may be CAMO, or an Part-145 organisation under contract) hires sufficiently qualified personnel with appropriate engineering experience and understanding of reliability concept (see AMC M.A.706).
6.3.2.It follows that failure to provide appropriately qualified personnel for the reliability programme may lead the competent authority to reject the approval of the reliability programme and therefore the aircraft maintenance programme.
6.4.Contracted maintenance
6.4.1.Whereas M.A.302 specifies that, the aircraft maintenance programme -which includes the associated reliability programme-, should be managed and presented by the CAMO to the competent authority, the CAMO may subcontract certain functions to the maintenance organisation under contract, provided this organisation proves to have the appropriate expertise.
6.4.2.These functions are:
(a)Developing the aircraft maintenance and reliability programmes,
(b)Performing the collection and analysis of the reliability data,
(c)Providing reliability reports, and
(d)Proposing corrective actions to the CAMO.
6.4.3.Notwithstanding the above decision to implement a corrective action (or the decision to request from the competent authority the approval to implement a corrective action) remains the CAMO prerogative and responsibility. In relation to paragraph 6.4.2(d) above, a decision not to implement a corrective action should be justified and documented.
6.4.4.The arrangement between the CAMO and the maintenance organisation should be specified in the maintenance contract (see Appendix XI to AMC M.A.708(c)) and the relevant CAME, and maintenance organisation procedures.
6.5.Reliability programme
In preparing the programme details, account should be taken of this paragraph. All associated procedures should be clearly defined.
6.5.1.Objectives
6.5.1.1. A statement should be included summarising as precisely as possible the prime objectives of the programme. To the minimum it should include the following:
(a)to recognise the need for corrective action,
(b)to establish what corrective action is needed and,
(c)to determine the effectiveness of that action.
6.5.1.2. The extent of the objectives should be directly related to the scope of the programme. Its scope could vary from a component defect monitoring system for a small CAMO, to an integrated maintenance management programme for a big CAMO. The manufacturer’s maintenance planning documents may give guidance on the objectives and should be consulted in every case.
6.5.1.3. In case of a MSG-3 based maintenance programme, the reliability programme should provide a monitor that all MSG-3 related tasks from the maintenance programme are effective and their periodicity is adequate.
6.5.2.Identification of items.
The items controlled by the programme should be stated, e.g. by ATA Chapters. Where some items (e.g. aircraft structure, engines, APU) are controlled by separate programmes, the associated procedures (e.g. individual sampling or life development programmes, constructor’s structure sampling programmes) should be cross referenced in the programme.
6.5.3.Terms and definitions.
The significant terms and definitions applicable to the Programme should be clearly identified. Terms are already defined in MSG-3, Part-145 and Part-M.
6.5.4.Information sources and collection.
6.5.4.1. Sources of information should be listed and procedures for the transmission of information from the sources, together with the procedure for collecting and receiving it, should be set out in detail in the CAME or MOE as appropriate.
6.5.4.2. The type of information to be collected should be related to the objectives of the Programme and should be such that it enables both an overall broad based assessment of the information to be made and also allow for assessments to be made as to whether any reaction, both to trends and to individual events, is necessary. The following are examples of the normal prime sources:
(a)Pilots Reports.
(b)Technical Logs.
(c)Aircraft Maintenance Access Terminal / On-board Maintenance System readouts.
(d)Maintenance Worksheets.
(e)Workshop Reports.
(f)Reports on Functional Checks.
(g)Reports on Special Inspections.
(h)Stores Issues/Reports.
(i)Air Safety Reports.
(j)Reports on Technical Delays and Incidents.
(k)Other sources: ETOPS, RVSM, CAT II/III.
6.5.4.3. In addition to the normal primary sources of information, due account should be taken of continuing airworthiness and safety information promulgated under Part 21 or Part 21 Light.
6.5.5.Display of information.
Collected information may be displayed graphically or in a tabular format or a combination of both. The rules governing any separation or discarding of information prior to incorporation into these formats should be stated. The format should be such that the identification of trends, specific highlights and related events would be readily apparent.
6.5.5.1. The above display of information should include provisions for ‘nil returns’ to aid the examination of the total information.
6.5.5.2. Where ‘standards’ or ‘alert levels’ are included in the programme, the display of information should be oriented accordingly.
6.5.6.Examination, analysis and interpretation of the information.
The method employed for examining, analysing and interpreting the programme information should be explained.
6.5.6.1. Examination.
Methods of examination of information may be varied according to the content and quantity of information of individual programmes. These can range from examination of the initial indication of performance variations to formalised detailed procedures at specific periods, and the methods should be fully described in the programme documentation.
6.5.6.2. Analysis and Interpretation.
The procedures for analysis and interpretation of information should be such as to enable the performance of the items controlled by the programme to be measured; they should also facilitate recognition, diagnosis and recording of significant problems. The whole process should be such as to enable a critical assessment to be made of the effectiveness of the programme as a total activity. Such a process may involve:
(a)Comparisons of operational reliability with established or allocated standards (in the initial period these could be obtained from in-service experience of similar equipment of aircraft types).
(b)Analysis and interpretation of trends.
(c)The evaluation of repetitive defects.
(d)Confidence testing of expected and achieved results.
(e)Studies of life-bands and survival characteristics.
(f)Reliability predictions.
(g)Other methods of assessment.
6.5.6.3. The range and depth of engineering analysis and interpretation should be related to the particular programme and to the facilities available. The following, at least, should be taken into account:
(a)Flight defects and reductions in operational reliability.
(b)Defects occurring on-line and at main base.
(c)Deterioration observed during routine maintenance.
(d)Workshop and overhaul facility findings.
(e)Modification evaluations.
(f)Sampling programmes.
(g)The adequacy of maintenance equipment and publications.
(h)The effectiveness of maintenance procedures.
(i)Staff training.
(j)Service bulletins, technical instructions, etc.
6.5.6.4. Where the CAMO relies upon contracted maintenance and/or overhaul facilities as an information input to the programme, the arrangements for availability and continuity of such information should be established and details should be included.
6.5.7.Corrective Actions.
6.5.7.1. The procedures and time scales both for implementing corrective actions and for monitoring the effects of corrective actions should be fully described. Corrective actions shall correct any reduction in reliability revealed by the programme and could take the form of:
(a)Changes to maintenance, operational procedures or techniques.
(b)Maintenance changes involving inspection frequency and content, function checks, overhaul requirements and time limits, which will require amendment of the scheduled maintenance periods or tasks in the approved maintenance programme. This may include escalation or de-escalation of tasks, addition, modification or deletion of tasks.
(c)Amendments to approved manuals (e.g. maintenance manual, crew manual).
(d)Initiation of modifications.
(e)Special inspections of fleet campaigns.
(f)Spares provisioning.
(g)Staff training.
(h)Manpower and equipment planning.
Note: Some of the above corrective actions may need the competent authority’s approval before implementation.
6.5.7.2. The procedures for effecting changes to the maintenance programme should be described, and the associated documentation should include a planned completion date for each corrective action, where applicable.
6.5.8.Organisational Responsibilities.
The organisational structure and the department responsible for the administration of the programme should be stated. The chains of responsibility for individuals and departments (Engineering, Production, Quality, Operations etc.) in respect of the programme, together with the information and functions of any programme control committees (reliability group), should be defined. Participation of the competent authority should be stated. This information should be contained in the CAME as appropriate.
6.5.9.Presentation of information to the competent authority.
The following information should be submitted to the competent authority for approval as part of the reliability programme:
(a)The format and content of routine reports.
(b)The time scales for the production of reports together with their distribution.
(c)The format and content of reports supporting request for increases in periods between maintenance (escalation) and for amendments to the approved maintenance programme. These reports should contain sufficient detailed information to enable the competent authority to make its own evaluation where necessary.
6.5.10. Evaluation and review.
Each programme should describe the procedures and individual responsibilities in respect of continuous monitoring of the effectiveness of the programme as a whole. The time periods and the procedures for both routine and non-routine reviews of maintenance control should be detailed (progressive, monthly, quarterly, or annual reviews, procedures following reliability ‘standards’ or ‘alert levels’ being exceeded, etc.).
6.5.10.1. Each Programme should contain procedures for monitoring and, as necessary, revising the reliability ‘standards’ or ‘alert levels’. The organisational responsibilities for monitoring and revising the ‘standards’ should be specified together with associated time scales.
6.5.10.2. Although not exclusive, the following list gives guidance on the criteria to be taken into account during the review.
(a)Utilisation (high/low/seasonal).
(b)Fleet commonality.
(c)Alert Level adjustment criteria.
(d)Adequacy of data.
(e)Reliability procedure audit.
(f)Staff training.
(g)Operational and maintenance procedures.
6.5.11. Approval of maintenance programme amendment
The competent authority may authorise the CAMO to implement in the maintenance programme changes arising from the reliability programme results prior to their formal approval by the authority when satisfied that;
(a)the Reliability Programme monitors the content of the Maintenance Programme in a comprehensive manner, and
(b)the procedures associated with the functioning of the ‘Reliability Group’ provide the assurance that appropriate control is exercised by the CAMO over the internal validation of such changes.
6.6.Pooling Arrangements.
6.6.1.In some cases, in order that sufficient data may be analysed it may be desirable to ‘pool’ data: i.e. collate data from a number of CAMOs of the same type of aircraft. For the analysis to be valid, the aircraft concerned, mode of operation, and maintenance procedures applied should be substantially the same: variations in utilisation between two CAMOs may, more than anything, fundamentally corrupt the analysis. Although not exhaustive, the following list gives guidance on the primary factors which need to be taken into account.
(a)Certification factors, such as: aircraft TCDS compliance (variant)/modification status, including SB compliance.
(b)Operational Factors, such as: operational environment/utilisation, e.g. low/high/seasonal, etc./respective fleet size operating rules applicable (e.g. ETOPS/RVSM/All Weather etc.)/operating procedures/MEL and MEL utilisation.
(c)Maintenance factors, such as: aircraft age maintenance procedures; maintenance standards applicable; lubrication procedures and programme; MPD revision or escalation applied or maintenance programme applicable
6.6.2.Although it may not be necessary for all of the foregoing to be completely common, it is necessary for a substantial amount of commonality to prevail. Decision should be taken by the competent authority on a case by case basis.
6.6.3.In case of a short term lease agreement (less than 6 month) more flexibility against the para 6.6.1 criteria may be granted by the competent authority, so as to allow the owner/CAMO to operate the aircraft under the same programme during the lease agreement effectivity.
6.6.4.Changes by any one of the CAMO to the above, requires assessment in order that the pooling benefits can be maintained. Where a CAMO wishes to pool data in this way, the approval of the competent authority should be sought prior to any formal agreement being signed between CAMOs.
6.6.5.Whereas this paragraph 6.6 is intended to address the pooling of data directly between CAMOs, it is acceptable that the CAMO participates in a reliability programme managed by the aircraft manufacturer, when the competent authority is satisfied that the manufacturer manages a reliability programme which complies with the intent of this paragraph.
Appendix II to AMC M.A.711(a)(3) — Subcontracting of continuing airworthiness management tasks
ED Decision 2021/009/R
1.Subcontracted continuing airworthiness management tasks
1.1.To actively control the standards of the subcontracted organisation, the CAMO should employ a person or group of persons who are trained and competent in the disciplines associated with M.A. Subpart G. As such, they are responsible for determining what maintenance is required, when it has to be performed, by whom and to what standard in order to ensure the continuing airworthiness of the aircraft to be operated.
1.2.The CAMO should conduct a pre-subcontract audit to establish that the organisation to be subcontracted can achieve the standards required by M.A. Subpart G in connection with those activities to be subcontracted.
1.3.The CAMO should ensure that the organisation to be subcontracted has sufficient and qualified personnel who are trained and competent in the functions to be sub-contracted. In assessing the adequacy of personnel resources, the CAMO should consider the particular needs of those activities that are to be subcontracted, while taking into account the subcontracted organisations existing commitments.
1.4.To be appropriately approved to subcontract continuing airworthiness management tasks, the CAMO should have procedures for the management control of these arrangements. The continuing airworthiness management exposition should contain relevant procedures to reflect its control of those arrangements made with the sub-contracted organisation.
1.5.Subcontracted continuing airworthiness management tasks should be addressed in a contract between the CAMO and the subcontracted organisation. The contract should also specify that the subcontracted organisation is responsible for informing the CAMO, that is in turn responsible for notifying the respective competent authority, of any subsequent changes that affect their ability to fulfil the contract.
1.6.The subcontracted organisation should use procedures which set out the manner of fulfilling its responsibilities with regard to the subcontracted activities. Such procedures may be developed by either the subcontracted organisation or the CAMO.
1.7.Where the subcontracted organisation develops its own procedures, they should be compatible with the continuing airworthiness management exposition and the terms of the contract. These should be accepted by the competent authority as extended procedures of the CAMO and as such should be cross-referenced from the continuing airworthiness management exposition. One current copy of the subcontracted organisation’s relevant procedures should be kept by the CAMO and should be accessible to the competent authority when needed.
Note: Should any conflict arise between the subcontracted organisation’s procedures and those of the CAMO, then the policy and procedures of the continuing airworthiness management exposition will prevail.
1.8.The contract should also specify that the subcontracted organisation’s procedures may only be amended with the agreement of the CAMO. The CAMO should ensure that these amendments are compatible with its continuing airworthiness management exposition and comply with M.A. Subpart G.
The CAMO should nominate the person responsible for continued monitoring and acceptance of the subcontracted organisation’s procedures and their amendments. The controls used to fulfil this function should be clearly set out in the amendment section of the continuing airworthiness management exposition detailing the level of CAMO involvement.
1.9.Whenever any elements of the continuing airworthiness management tasks are subcontracted, the CAMO personnel should have access to all relevant data in order to fulfil their responsibilities.
Note:The CAMO retains the authority to override, whenever necessary for the continuing airworthiness of their aircraft, any recommendation of the subcontracted organisation.
1.10.The CAMO should ensure that the subcontracted organisation continues to have qualified technical expertise and sufficient resources to perform the sub-contracted tasks while complying with the relevant procedures. Failure to do so may invalidate the CAMO approval.
1.11.The contract should provide for competent authority monitoring.
1.12.The contract should address the respective responsibilities to ensure that any findings arising from the competent authority monitoring will be closed to the satisfaction of the competent authority.
2.Accomplishment
This paragraph describes the topics which may be applicable to such subcontracting arrangements.
2.1.Scope of work
The type of aircraft and their registrations, engine types and/or components subject to the continuing airworthiness management tasks contract should be specified.
2.2.Maintenance programme development and amendment
The CAMO may subcontract the preparation of the draft maintenance programme and any subsequent amendments. However, the CAMO remains responsible for assessing that the draft proposals meet its needs and for obtaining competent authority approval; the relevant procedures should specify these responsibilities. The contract should also stipulate that any data necessary to substantiate the approval of the initial programme or an amendment to this programme should be provided for CAMO agreement and/or competent authority upon request.
2.3.Maintenance programme effectiveness and reliability
The CAMO should have a system in place to monitor and assess the effectiveness of the maintenance programme based on maintenance and operational experience. The collection of data and initial assessment may be made by the subcontracted organisation; the required actions are to be endorsed by the CAMO.
Where reliability monitoring is used to establish the effectiveness of the maintenance programme, this may be provided by the subcontracted organisation and should be specified in the relevant procedures. Reference should be made to the approved maintenance and reliability programme. Participation of the CAMO’s personnel in reliability meetings with the subcontracted organisation should also be specified.
When providing reliability data, the subcontracted organisation is limited to working with primary data/documents provided by the CAMO or data provided by the CAMO’s contracted maintenance organisation(s) from which the reports are derived. The pooling of reliability data is permitted if it is acceptable to the competent authority.
2.4.Permitted variations to the maintenance programme
The reasons and justification for any proposed variation to scheduled maintenance may be prepared by the subcontracted organisation. Acceptance of the proposed variation should be granted by the CAMO. The means by which the CAMO acceptance is given should be specified in the relevant procedures. When outside the limits set out in the maintenance programme, the CAMO is required to obtain approval by the competent authority.
2.5.Scheduled maintenance
Where the subcontracted organisation plans and defines maintenance checks or inspections in accordance with the approved maintenance programme, the required liaison with the CAMO, including feedback, should be defined.
The planning control and documentation should be specified in the appropriate supporting procedures. These procedures should typically set out the CAMO’s level of involvement in each type of check. This will normally involve the CAMO assessing and agreeing to a work specification on a case-by-case basis for base maintenance checks. For routine line maintenance checks, this may be controlled on a day-to-day basis by the subcontracted organisation subject to appropriate liaison and CAMO controls to ensure timely compliance. This may typically include but is not necessarily limited to:
applicable work package, including job cards;
scheduled component removal list;
ADs to be incorporated;
modifications to be incorporated.
The associated procedures should ensure that the CAMO is informed in a timely manner on the accomplishment of such tasks.
2.6.Quality monitoring
The CAMO’s quality system should monitor the adequacy of the subcontracted continuing airworthiness management task performance for compliance with the contract and with M.A. Subpart G. The terms of the contract should therefore include a provision allowing the CAMO to perform a quality surveillance (including audits) of the subcontracted organisation. The aim of the surveillance is primarily to investigate and judge the effectiveness of those subcontracted activities and thereby to ensure compliance with M.A Subpart G and the contract. Audit reports may be subject to review when requested by the competent authority.
2.7.Access to the competent authority
The contract should specify that the subcontracted organisation should always grant access to the competent authority.
2.8.Maintenance data
The maintenance data used for the purpose of the contract should be specified, together with those responsible for providing such documentation and the competent authority responsible for the acceptance/approval of such data, when applicable. The CAMO should ensure that such data, including revisions, is readily available to the CAMO personnel and to those in the subcontracted organisation who may be required to assess such data. The CAMO should establish a ‘fast track’ means to ensure that urgent data is transmitted to the subcontractor in a timely manner. Maintenance data is defined in M.A.401(b) or ML.A.401(b).
2.9.Airworthiness directives (ADs)
While the various aspects of AD assessment, planning and follow-up may be accomplished by the subcontracted organisation, AD embodiment is performed by a maintenance organisation. The CAMO is responsible for ensuring timely embodiment of the applicable ADs and is to be provided with notification of compliance. It, therefore, follows that the CAMO should have clear policies and procedures on AD embodiment supported by defined procedures which will ensure that the CAMO agrees to the proposed means of compliance.
The relevant procedures should specify:
what information (e.g. AD publications, continuing airworthiness records, flight hours/cycles, etc.) the subcontracted organisation needs from the CAMO;
what information (e.g. AD planning listing, detailed engineering order, etc.) the CAMO needs from the subcontracted organisation in order to ensure timely compliance with the ADs.
To fulfil the above responsibility, the CAMO should ensure that it receives current mandatory continued airworthiness information for the aircraft and equipment it is managing.
2.10.Service bulletin (SB) modifications
The subcontracted organisation may be required to review and make recommendations on the embodiment of an SB and other associated non-mandatory material based on a clear policy established by the CAMO. This should be specified in the contract.
2.11.Mandatory life limitation or scheduled maintenance controls and component control/removal forecast
Where the subcontracted organisation performs planning activities, it should be specified that the organisation should receive the current flight cycles, flight hours, landings and/or calendar controlled details, as applicable, at a frequency to be specified in the contract. The frequency should be such that it allows the organisation to properly perform the subcontracted planning functions. It, therefore, follows that there will need to be adequate liaison between the CAMO, the contracted maintenance organisation(s) and the subcontracted organisation. Additionally, the contract should specify how the CAMO will be in possession of all current flight cycles, flight hours, etc., so that it may assure the timely accomplishment of the required maintenance.
2.12.Engine health monitoring
If the CAMO subcontracts the on-wing engine health monitoring, the subcontracted organisation should receive all the relevant information to perform this task, including any parameter reading deemed necessary to be supplied by the CAMO for this control. The contract should also specify what kind of feedback information (such as engine limitation, appropriate technical advice, etc.) the organisation should provide to the CAMO.
2.13.Defect control
Where the CAMO has subcontracted the day-to-day control of technical log deferred defects, this should be specified in the contract and should be adequately described in the appropriate procedures. The operator’s MEL/CDL provides the basis for establishing which defects may be deferred and the associated limits. The procedures should also define the responsibilities and actions to be taken for defects such as AOG situations, repetitive defects, and damage beyond the type certificate holder’s limits.
For all other defects identified during maintenance, the information should be brought to the attention of the CAMO which, depending upon the procedural authority granted by the competent authority, may determine that some defects can be deferred. Therefore, adequate liaison between the CAMO, its subcontracted organisation and contracted maintenance organisation should be ensured.
The subcontracted organisation should make a positive assessment of potential deferred defects and consider the potential hazards arising from the cumulative effect of any combination of defects. The subcontracted organisations should liaise with the CAMO to get its agreement following this assessment.
Deferment of MEL/CDL allowable defects can be accomplished by a contracted maintenance organisation in compliance with the relevant technical log procedures, subject to the acceptance by the aircraft commander.
2.14.Mandatory occurrence reporting
All incidents and occurrences that meet the reporting criteria defined in Part-M and Part-145 should be reported as required by the respective requirements. The CAMO should ensure that adequate liaison exists with the subcontracted organisation and the maintenance organisation.
2.15.Continuing airworthiness records
They may be maintained and kept by the subcontracted organisation on behalf of the CAMO, which remains the owner of these documents. However, the CAMO should be provided with the current status of AD compliance and life-limited parts and time-controlled components in accordance with the agreed procedures. The CAMO should also be granted unrestricted and timely access to the original records as and when needed. Online access to the appropriate information systems is acceptable.
The record-keeping requirements of Part-M should be met. Access to the records by duly authorised members of the competent authority should be granted upon request.
2.16.Maintenance check flight (MCF) procedures
MCFs are performed under the control of the operator in coordination with the CAMO. MCF requirements from the subcontracted organisation or contracted maintenance organisation should be agreed by the operator/CAMO.
2.17.Communication between the CAMO and the subcontracted organisation
2.17.1. In order to fulfil its airworthiness responsibility, the CAMO needs to receive all the relevant reports and relevant maintenance data. The contract should specify what information should be provided and when.
2.17.2. Meetings provide one important cornerstone whereby the CAMO can fulfil part of its responsibility for ensuring the airworthiness of the operated aircraft. They should be used to establish good communication between the CAMO, the subcontracted organisation and the contracted maintenance organisation. The terms of the contract should include, whenever appropriate, the provision for a certain number of meetings to be held between the involved parties. Details of the types of liaison meetings and associated terms of reference of each meeting should be documented. The meetings may include but are not limited to all or a combination of:
(a)Contract review
Before the contract is enforced, it is very important that the technical personnel of both parties, that are involved in the fulfilment of the contract, meet in order to be sure that every point leads to a common understanding of the duties of both parties.
(b)Work scope planning meeting
Work scope planning meetings may be organised so that the tasks to be performed are commonly agreed.
(c)Technical meeting
Scheduled meetings should be organised in order to review on a regular basis and agree on actions on technical matters such as ADs, SBs, future modifications, major defects found during shop visit, reliability, etc.
(d)Quality meeting
Quality meetings should be organised in order to examine matters raised by the CAMO’s quality surveillance and the competent authority’s monitoring activity and to agree on necessary corrective actions.
(e)Reliability meeting
When a reliability programme exists, the contract should specify the involvement of the CAMO and of the subcontracted organisation in that programme, including their participation in reliability meetings. Provision to enable competent authority participation in the periodical reliability meetings should also be made.