FAQ n.20101

Do I, as a DOA holder, need to obtain confirmation from the maintenance organisation that my design change has been incorporated on a specific product?

Answer

No. After the design change is approved, there is no requirement on a design organisation to keep managing the configuration control of the product(s) on which its design changes are installed. Thus, it is not mandatory to collect confirmation records from the organisations performing the installation of the design changes.

Last updated
23/11/2015

Was this helpful?